What is the Typical Timeline for Bathroom Remodeling in Virginia?

Filed Under: Bathroom    by: Steve Kayhill

Scheduling is one of the major concerns when planning a bathroom remodeling in Virginia. Depending on the scope of work, your project could take anywhere from one week to a few months. Factor in special orders or relocating plumbing fixtures and this schedule could extend even longer.

While much depends on the speed of your contractor, a typical timeline looks something like this:

Initial Stages

You’ve decided that a bathroom remodeling project is required and in the budget. The first stage of this project involves meeting with potential contractors to go over the design and draw up a quotation. This process takes about one to two weeks from initial contact, depending on your availability and the number of contractors you choose to have quote.

Some contractors ask their clients visit the company showroom to sign a contract or view product samples. This can often be done within the above time period, assuming the contractor delivers their quotation within a reasonable span.

Once the contract has been signed, material selection begins. This process may take one to four weeks, depending on your tastes and preferences. An extensive bathroom remodeling in Virginia involves several types of materials, from flooring and tile, to bathroom fixtures, cabinetry and lighting. You may have to visit several different retailers to view samples, or spend hours online browsing web catalogs.

Delivery and Demolition

The second major stage of a bathroom renovation involves waiting for the materials to arrive. Demolition can be completed simultaneously, but only if the homeowner has reliable and convenient access to another bathroom. If not, the demolition process (which typically lasts between 1 and 5 days) should be done immediately following installation to minimize downtime.

Delivery of materials can stretch for a long time, depending on the type of materials ordered and the jobsite location. Many contractors recommend sourcing local building materials where possible, or ordering from Virginia retailers to cut down on transportation costs and wait time. For standard materials, expect a lead time of 4 to 7 days, and 4 to 6 weeks is not unheard of for special order lead times.

Installation and Clean Up

The final stages of your Virginia bathroom remodeling project are coming up. Things get exciting from here on, with flooring installation, electrical and plumbing work and vanity installation helping to bring the room together.

Depending again on the scope of work, installation time ranges from 2 to 3 weeks. This could happen in stages, with each tradesman requiring a span of time to work in the room. Experienced contractors know how to stage the project in order to optimize efficiency and ensure that work moves smoothly from day to day.

Always allow for wait times during the installation process. Tile grout needs to dry or cure, flooring may need to set and paint needs to dry. All goods things come to those who wait, or in this case, a quality built bathroom comes to homeowners who wait.

Clean up often takes just one or two days. Smart contractors handle this throughout the course of installation and end the project with minimal finishing work and clean up.

Bathroom remodeling in Virginia requires a significant amount of work. Understand the elements of each stage and learn how to value the time spent on quality work. Don’t rush things, but instead allow your Virginia contractor to take the time required for job well done.